A Continuous Gondola
Up to 11 Beam Capacity
High Speed Beam Unloading
The Beam Transfer System consists of a series of short gondolas (33 feet) without the end bulkheads. 28 ft. or 30 ft. pre-cast
concrete bridge beams are set in place on a series of high capacity dollys.
A winch system at either end of the car provides the power needed to index the beams once at the work site.
Speed-Up Bridge Replacement
An empty Slot Machine on the opposite side of bridge can be used to receive old bridge components when removed.

|

Eliminate Work Windows
10 beams off-loaded in 1 hour and 50 minutes.
3 times faster than gondola-to-ground methods.
Fewer men in harm's way, too.
Eliminate Re-Handling
Separate car (gondola) shipments cause re-handling of each component. Keeping the shipment grouped in a larger consist allows
for better planning of the work window.